Cautions for the work of gantry crane . Its metal structure is like a gantry frame. Two feet are installed under the main beam, which can walk directly on the ground track. The main beam can have overhanging cantilever beams at both ends.
1. When lifting a heavy object once per shift (or when the load reaches the weight), the heavy object should be put down again after being lifted 0.5 meters above the ground, and the brake performance should be checked to ensure that it is reliable before normal operation.
2. During operation, the operator should ring the alarm for the following operations as required.
1. Lifting and landing heavy objects; when driving large and small vehicles.
2. When the gantry crane is driving and the line of sight is unclear, it should continuously ring the alarm.
3. When the gantry crane is approaching another crane within the span.